About the Project

Project Scope & Benefits

  • New Line 949 total length approximately 6.7 miles located in the City of Rochester (2.5 miles) and Town of Gates (4.2 miles).
  • Expansion and upgrade of Stations 48 and 418 to accommodate the receipt of Line 949.
  • Minimizing land impacts by installing Line 949 along existing electric transmission line rights-of-way and replacing single-circuit poles with double-circuit poles.
  • The project received an amendment to a PSC Article VII Certificate of Environmental Compatibility and Public Need, and will require PSC approval of an Environmental Management and Construction Plan (EM&CP).
  • Project Outreach will be conducted via in-person and virtual meetings, project fact  sheets/update mailings, and website updates.

Regional Benefits

  • The project will provide a direct impact and benefit to over 65 thousand individuals who live and work in the area served by these facilities.
  • The upgraded and expanded facilities will meet the growing demand for additional power in the Rochester region, and support economic growth.
  • The upgrades will improve the reliability and resiliency of the entire transmission system, ensuring that the safe and reliable distribution of power is maintained.
Simulation Along Canal Trail

Get in touch

T: 888-379-9995
E: [email protected]

Ask a question?

Name is a required field
Email is a required field
Street Address is a required field
Question is a required field